-
17/01/25
signaling successful completion of the full capacity takeover of the first batch of 23 new energy projects in the Lower Jinsha River Integrated Wind-Solar-Hydro-Storage Base (Yunnan side)。
-
10/01/25
the ecological operation test of stratified water withdrawal involves blocking the discharge of low-temperature river water from the lower layer of the reservoir through dropped stop log gates。
-
31/12/24
아니오
-
24/12/24
CYPC
-
17/12/24
CYPC
-
12/12/24
with great difficulties in lifting operation and high demand for precision. The rotor hoisting was realized in the remote intelligent operation cabin。